Supply the application basis
ASTM A193/A193M includes bolting for high-temperature or high-pressure applications, but its title does not approve B7 for every hot joint. Give the supplier the selected grade, specification edition, component dimensions, and governing construction code. Identify the engineer-approved material requirement rather than asking a sourcing quotation to establish an allowable stress. If the project uses an ASME material designation, make that requirement explicit instead of treating a similarly numbered ASTM certificate as automatic compliance.

Drawing detail
Where does length start?
Locate both arrows on the end faces when the drawing specifies overall length.
Describe temperature as a duty
State the specified bolt metal temperature, normal operating condition, credible excursions, and time spent at those conditions. Explain whether a value describes process fluid, surrounding air, or the fastener itself. Include anticipated cycling and exposure conditions when they affect the procurement specification. Where the engineering basis remains incomplete, label it as an open technical item and request an assumption in the quotation. An unqualified maximum temperature in a sales table cannot close that item.
Check the offered product route
B7 is commonly supplied as quenched-and-tempered alloy steel. Request the actual material specification and condition, heat identity, applicable mechanical results, and any finishing operations relevant to the final supply. Match the test evidence to the offered diameter and product form. Treat coating, nut material, lubrication, and additional testing as separately defined requirements. The fact that an alternative has higher room-temperature strength does not make it an approved replacement for the engineer's selected bolting.
Use a bounded quote note
An illustrative RFQ note could read: Quote the B7 studs shown on the attached drawing; list the material edition, supplied condition, and certification included; identify any exception to the project temperature-duty sheet. This requests a transparent offer without asking the vendor to approve the joint. During comparison, flag a quotation stating only B7 high-temperature grade if another explicitly addresses the drawing revision and documentation. Resolve the missing scope before interpreting a lower unit price as a saving.