Drawing-based quotations PDF and STEP accepted
Keldspan Alloys
Home / Documentation

Quality documentation

Agree the inspection scope before pricing. The quotation should identify the documents, tests and acceptance criteria for your specific order.

Before production

Define your acceptance criteria.

Factory inspection equipment →

Include the governing specification and its revision. Flag any buyer witness or third-party hold point before the production route is agreed.

Download the RFQ spreadsheet (.csv) ↓
Material certificates and heat traceability

If a material test certificate is required, specify the document type, applicable standard and issuing party. State how the heat or lot number should appear on the parts, packaging and paperwork.

Dimensions and threads

Identify critical dimensions, tolerances, thread form and the required inspection record. Specify the sampling plan and any features requiring individual measurement.

Additional testing

List any positive material identification, mechanical testing, corrosion testing or independent witnessing. Include the method, sampling and acceptance criteria for the supplier to review.

Packing and shipment release

Confirm marking, separation of lots, packing lists and any records the buyer must approve before dispatch. A sample report supplied for review should be clearly distinguished from the actual shipment documents.

Have an inspection specification?

Include the document revision and any mandatory inspection hold points with your enquiry.

Request a quote