Scoping a Cryogenic Flange Bolting Inquiry for LNG Service

Build an LNG bolting inquiry around the actual connection, approved material selection and documented service conditions instead of a generic cryogenic label.

Describe the connection being purchased

LNG service identifies an application, not a complete fastener specification. Begin with the line or equipment tag and the approved flange assembly drawing. Include the governing piping or equipment code, flange standard, nominal size, rating class, facing and material references. ASME B31.3 includes cryogenic process piping in its scope, while B16.5 addresses flanges and related bolting provisions. Neither standard's title provides an automatic material selection for every connection within an LNG facility.

V-notched impact specimen with fields for specimen size, test temperature and absorbed energy

Obtain the local service basis

Ask engineering to state the relevant minimum metal temperature and pressure conditions for the bolting location. Identify whether insulation, enclosure details or a thermal assessment affects the supplied requirements, and attach the approved reference where relevant. Request the selected bolt and nut specifications, grades and classes rather than inviting a supplier to infer them from LNG alone. Any alternative should be quoted with a deviation list for review by the project's designated technical authority.

Define the complete evidence package

List required material reports, impact evidence or documented exemptions, dimensional records and component traceability. Specify coating, lubricant or cleanliness restrictions only where the project has defined them; a supplier's standard commercial finish should be visible in its offer. If the inquiry includes special qualification testing, provide the procedure and acceptance criteria or request a separately priced proposal. Distinguish such work from routine product documentation so its cost and lead time can be evaluated.

Keep neighboring services distinguishable

A practical inquiry may contain an LNG liquid-transfer flange and an adjacent ambient purge connection with similar nominal dimensions. Give each its own line identifier, material callout, temperature basis and document requirements instead of merging them as LNG flange bolts. Ask the supplier to preserve those identifiers on its quotation and packing schedule. This avoids accidental substitution during buying or receipt while leaving material suitability and joint design decisions with the responsible engineer.

Request a quote against your drawing

Attach a PDF or STEP drawing. Include the revision, quantity and project acceptance requirements.

Upload a drawing